SERVICES / TENANT IMPROVEMENT

VACANT SUITE IN. SIGNED TENANT WORKING.

Turnover is a countdown to rent. We take the space plan, pull the permits, run the trades, pass the inspections, and hand back a finished suite that is construction cleaned and ready for furniture, without the floor above filing noise complaints.

Partially finished commercial suite with new metal stud walls, ceiling grid, and fresh paint
PLAN
SCHEDULE TIED TO LEASE DATE
PERMIT
PULLED AND INSPECTED
QUIET
LOUD WORK OFF HOURS
TURNKEY
CLEANED AND KEY READY

TENANT IMPROVEMENT / PROGRAMS + SCOPE

Buildouts priced against the space plan, not a square foot guess.

A paint-and-carpet refresh and a full demising of a half floor sit at opposite ends of the same catalog. Scope comes from the drawings, the landlord work letter, and what the tenant negotiated.

  • *Refresh
  • +Buildout
  • OKTurnkey

11 trade packages

Demolition, framing, drywall, ceilings, flooring, paint, doors, electrical, data, HVAC modifications, and final cleaning.

Scope the turnover to the lease you signed.

Every package includes permit handling, trade coordination, punch list closeout, and final construction cleaning.

  • 01PRG-REFRESH

    Refresh

    Cosmetic turn

    Paint, flooring, ceiling tile replacement, and hardware so a clean suite shows the week it goes vacant

  • 02PRG-RECONFIG

    Reconfig

    Walls moved

    Selective demolition and new partitions to fit an incoming tenant into an existing footprint

  • 03PRG-DEMISE

    Demise

    Space split

    Demising walls, separate entries, and utility separation to divide a large suite into leasable units

  • 04PRG-FULL

    Full

    Shell to finish

    Complete interior buildout from bare shell through inspections, finishes, and key handover

WHAT THE SCOPE COVERS

Everything between the empty suite and the walkthrough.

One manager holds the drawings, the permit file, the trade schedule, and the punch list. Tenants and brokers get one status update instead of conflicting answers from five subcontractors.

STRUCTURE

Selective demolition and haul off

Metal stud framing and demising walls

Drywall, taping, and level finishes

Suspended ceiling grid and tile

FINISHES

Carpet tile, LVT, and base installation

Paint and wall covering

Door frames, slabs, and hardware sets

Millwork, counters, and break room fixtures

SYSTEMS

Lighting, circuits, and panel work

Data cabling and device rough-in

Diffuser and ductwork modifications

Fire alarm and sprinkler head relocation

CLOSEOUT

Permit applications and inspection scheduling

Punch list walkthrough with the tenant

Final construction cleaning

Warranty and closeout documentation

Building work around people who never moved out.

  • Occupied floor sequencing

    Core drilling, demolition, and anything loud runs after hours so neighboring tenants never file a complaint.

  • Elevator and corridor protection

    Protected paths, dedicated freight windows, and daily debris removal keep common areas presentable during construction.

  • Landlord work letter scope

    We separate landlord obligation from tenant allowance in writing so billing does not become a lease dispute.

Turn the suite before the rent clock starts.

One agreement covers demolition through final cleaning with a schedule you can share with your broker.

COMPARE PROGRAMS->

TENANT IMPROVEMENT MANAGEMENT

ONE MANAGER HOLDING EVERY TRADE.

Your facility manager sequences the trades, chases the inspector, and runs the punch list. You approve drawings and change orders instead of refereeing a jobsite.

  1. 01

    PRICE THE PLAN

    Drawings, the work letter, and site conditions are reviewed into a line-item budget with a dated schedule.

  2. 02

    PERMIT AND MOBILIZE

    Applications are filed, protection is installed, and trades are booked against the lease commencement date.

  3. 03

    BUILD AND INSPECT

    Work is sequenced by trade with inspections scheduled as each phase closes and progress photos sent weekly.

  4. 04

    PUNCH AND HAND OVER

    The tenant walks the suite, punch items are corrected, the space is construction cleaned, and keys change hands.

READY FOR A TENANT IMPROVEMENT PROPOSAL?

SEND THE PLAN. GET A REAL NUMBER.

Request a buildout estimate. You get a line-item budget, a trade schedule, and a hand-back date before demolition begins.

REQUEST A PROPOSAL

TELL US ABOUT THE BUILDING.

A facility manager replies within one business day to schedule a walkthrough. Building emergencies: call us instead, any hour.

Which services do you need?
How urgent is it?
  • DEMO
  • FRAMING
  • CEILINGS
  • FLOORING
  • POWER
  • PUNCH