FIND THE WATER. THEN REMOVE THE MOLD.
Mold in a commercial building is a symptom. We trace the moisture that fed it, contain the affected area under negative air, remove what cannot be cleaned, and verify the result with a third-party clearance test before the space goes back into service.

- SOURCE
- MOISTURE TRACED FIRST
- HEPA
- NEGATIVE AIR CONTAINMENT
- CLEARED
- THIRD-PARTY VERIFICATION
- FILED
- INSURER-READY DOCUMENTS
MOLD REMEDIATION / PROGRAMS + SCOPE
Remediation scaled to what the assessment actually finds.
A single stained ceiling tile and a saturated wall cavity behind vinyl covering are not the same job. Scope follows moisture readings and the affected square footage, not a guess made from the hallway.
- *Contained
- +Verified
- OKDocumented
4 containment classes
Assessment, containment, negative air, material removal, antimicrobial treatment, drying, clearance, and reporting.
Match the response to the affected area.
Every program includes moisture source identification, containment, and a written remediation record.
- 01PRG-ASSESS
Assess
Inspection only
Moisture mapping, cavity readings, and a written finding on whether remediation is warranted
- 02PRG-SPOT
Spot
Under 10 sq ft
Small contained removal of affected finishes with HEPA cleaning of the surrounding area
- 03PRG-ZONE
Zone
Room level
Full containment with negative air, material demolition, treatment, and clearance testing
- 04PRG-STRUCT
Structure
Multi-area
Phased remediation across floors or units with tenant notices and staged re-occupancy
WHAT THE SCOPE COVERS
What gets contained, what gets removed, what gets verified.
Porous material that has been wet and colonized comes out. Non-porous material gets cleaned and tested. The written scope says which is which before a single wall is opened, so nobody argues about it mid-project.
MOISTURE
Infrared and meter moisture mapping
Wall cavity and insulation probing
Roof, window, and plumbing leak tracing
Humidity and dew point readings
CONTAINMENT
Sealed poly barriers and zippered entry
Negative air machines with HEPA filtration
Air scrubbing during active work
Isolation of return air and shared plenums
REMOVAL
Affected drywall and ceiling tile demolition
Wet insulation and carpet pad extraction
HEPA vacuuming and antimicrobial treatment
Structural drying before rebuild
VERIFICATION
Independent post-remediation testing
Visual clearance walkthrough
Photo log and daily work record
Report package for insurer and tenants
Where Minnesota buildings actually grow mold.
Ice dam and freeze-thaw leaks
Winter meltwater backs up under shingles and soaks top-floor wall cavities that stay damp until spring.
Mechanical and janitor rooms
Humid summer air, uninsulated lines, and floor drains make these the first rooms to show growth in July.
Behind vinyl wall covering
Impermeable finishes trap vapor against gypsum in cooled buildings, so growth is advanced before anyone sees a stain.
Get a written finding before you get a demolition crew.
Assessment, containment, removal, and clearance handled under one agreement with one facility manager on the file.
COMPARE PROGRAMS->MOLD REMEDIATION MANAGEMENT
MOLD WORK YOU CAN HAND TO YOUR INSURER.
Your facility manager coordinates the assessment, the containment crew, the independent testing firm, and the rebuild. Every reading, photo, and invoice lands in one file you can forward without editing.
- 01
ASSESS AND MAP
Moisture readings, cavity inspection, and source identification produce a written scope before any containment goes up.
- 02
CONTAIN AND REMOVE
Negative air containment is built, affected materials are removed, and surviving surfaces are HEPA cleaned and treated.
- 03
VERIFY INDEPENDENTLY
A third-party hygienist samples the cleared space so the passing result is not written by the crew that did the work.
- 04
REBUILD AND CLOSE
Finishes are restored, the moisture source repair is confirmed, and the documentation package is delivered.
READY FOR A MOLD REMEDIATION PROPOSAL?
FOUND A STAIN? GET IT ASSESSED.
Request an assessment. You get moisture readings, a written finding, and a scoped remediation price before anything is demolished.
- ASSESS
- CONTAIN
- REMOVE
- TREAT
- VERIFY
- DOCUMENT