SERVICES / CONSTRUCTION CLEANUP

TURNOVER READY. NOT ALMOST READY.

Rough, final, and post-punch cleaning for Minnesota buildouts, tenant improvements, and new construction. Drywall dust out of the ductwork and the drawer slides, adhesive and stickers off the glass, floors protected, and the space handed over on the day the certificate hangs.

Cleanup crew removing drywall dust and window stickers in a newly finished commercial buildout
3
PHASES ROUGH FINAL PUNCH
DUST
PULLED FROM EVERY CAVITY
GC
SCHEDULE NOT OURS
PUNCH
RETURN TRIPS INCLUDED

CONSTRUCTION CLEANUP / PROGRAMS + SCOPE

Cleanup sequenced with the trades, not after them.

A final clean before the painters finish is wasted money. Phases are booked against the construction schedule so each pass lands after the trade that creates the mess and before the one that needs a clean surface.

  • *Rough
  • +Final
  • OKPunch

3 phase passes

Debris haul, dust extraction, adhesive and sticker removal, fixture wipe, floor protection, and final glass.

Book the phases the project actually needs.

Every phase includes a supervisor on site, a documented punch walk, and disposal handled to the site waste plan.

  • 01PRG-ROUGH

    Rough

    Mid-project

    Debris removal, sweeping, and gross dust control while trades are still working the space

  • 02PRG-FINAL

    Final

    Pre-turnover

    Full detail of every surface, fixture, and finish so the space reads as complete

  • 03PRG-PUNCH

    Punch

    Post-walk

    Return visit clearing touch-up dust, hand prints, and anything flagged on the punch list

  • 04PRG-TURNKEY

    Turnkey

    All phases

    All three passes on one agreement with a single supervisor holding the schedule end to end

WHAT THE SCOPE COVERS

Construction dust settles three times before it stops.

Drywall dust migrates into ducts, drawer tracks, light housings, and the tops of door frames, then falls again after the HVAC runs. The scope covers each pass so the tenant is not still finding it in week two.

DEBRIS

Trade debris and offcut removal

Packaging and crate breakdown

Dumpster staging and hauling

Floor protection removal and disposal

DUST CONTROL

HEPA vacuuming of all surfaces

Ductwork and diffuser wipe down

Light housing and lens cleaning

Ledge, frame top, and soffit detail

FINISHES

Adhesive and sticker removal

Paint overspray and caulk cleanup

Cabinet, drawer, and shelf interiors

Fixture, hardware, and outlet plate wipe

FINAL PASS

Interior and exterior glass cleaning

Floor scrub, burnish, or finish as specced

Restroom fixture and mirror detail

Supervisor punch walk with the project team

Crews who have worked a construction site before.

  • Tenant improvement buildouts

    Occupied-building work staged with dust containment and freight elevator timing so the tenants down the hall never notice the project.

  • Medical and lab fit-outs

    Clean-surface protocols for spaces that must pass an infection control or equipment commissioning review before anyone moves in.

  • Ground-up commercial and industrial

    High-bay dust extraction, slab cleaning, and phased passes coordinated directly with the general contractor superintendent.

Get the space handed over clean the first time.

One supervisor holds all three phases, so nobody is negotiating scope on the morning of the certificate of occupancy walk.

COMPARE PROGRAMS->

CONSTRUCTION CLEANUP MANAGEMENT

THE LAST TRADE ON SITE SETS THE IMPRESSION.

Cleanup is the pass everyone sees and nobody plans. Your facility manager coordinates directly with the superintendent, holds the phase dates against the construction schedule, and walks the punch list with the project team.

  1. 01

    READ THE SCHEDULE

    Phase dates are set against the construction calendar so crews arrive after the trade that creates the mess.

  2. 02

    STAGE THE SITE

    Access, power, water, elevator time, and waste disposal are confirmed before crews mobilize.

  3. 03

    CLEAN IN PASSES

    Rough, final, and punch passes run as separate crews with a supervisor verifying each phase on site.

  4. 04

    WALK THE PUNCH

    A joint walk with the project team clears flagged items and closes the phase in writing.

READY FOR A CONSTRUCTION CLEANUP PROPOSAL?

SEND THE SCHEDULE. WE’LL PHASE THE CLEAN.

Share the square footage and the turnover date. You get a phased scope and pricing that fits the construction calendar.

REQUEST A PROPOSAL

TELL US ABOUT THE BUILDING.

A facility manager replies within one business day to schedule a walkthrough. Building emergencies: call us instead, any hour.

Which services do you need?
How urgent is it?
  • DEBRIS
  • DUST
  • ADHESIVE
  • FIXTURES
  • GLASS
  • PUNCH